Put any change to the job in writing: what is added or removed, what it costs and how many days it moves the schedule. Both sides sign before the work starts.
Owner / client
Added or removed work
Notes
A written change to the work, price or schedule of a job after the contract is signed. Both sides sign it, and it becomes part of the contract.
Any time the client asks for extra work, a hidden condition changes the job or a material has to be swapped. Get it signed before the extra work starts; extras are much harder to collect on without a signature.
Type a minus sign before the rate on that line, for example -250. The total subtracts it.
No. It amends it. Staple or attach it to the original contract and write the contract date at the top.